Change Order (14/90)

[The Yard] Reindeer Games

AO: The Yard Q: Saints (147/135) , Cheesesteak PAX: Deadhead, Moen (153/100), Floaties (110/100), Yard dog. 99, Quick Release (167/175), Pebbles, Dovetail, Frizzle, Love, Deuces, Ted Lasso, Crack, Cheesesteak, Squeeky, Saints (147/135), Motel 6, Dovetail, Change Order (14/90), Blair Witch FNGs: None COUNT: 19 CONDITIONS: Low 30s WARMUP: SSH, TTT, Imperial walkers, LBAC, pool pisser

[The Yard] Reindeer Games Read More »

[ao-burn] AMRAP

AO: ao-burn Q: Dovetail PAX: Blair Witch, Finch, Hyzer (139/200), Catan, Lunch Lady, Change Order (14/90), Dovetail, Popeyes, Pickleball, @pickles FNGs: None COUNT: 10 CONDITIONS:cool WARMUP: SSH, weed picker, windmills, imperial walker, bac, mosey THE THANG: 3 rounds of AMRAP 30 sec on eight stations with a 5 minute run between each, battle rope, Carolina

[ao-burn] AMRAP Read More »

Scroll to Top